KUB ENGINEERING BUILDING
cORPORATE OFFICE ADDITION
KUB ENGINEERING
YEAR:
2019
LOCATION:
Knoxville, TN
SIZE:
50,000 SF
SUSTAINABILITY:
Certified LEED
PROJECT DESCRIPTION:
Rather than constructing a new Engineering and Operations Building, the architectural team designed a 50,000 SF addition to the existing facility that complemented the material rhythm already in place. The two buildings connect through an open, light-filled staircase with their respective breakrooms overlooking it.
To allow for a higher level of employee collaboration, open workstations and flexible work and meeting spaces along the perimeter were designed for all departments on every floor. Workspaces wrapped by floor-to-ceiling glass open to views of campus spaces and walking trails beyond. The glass also allows ample daylight into the workspace, which research has shown improves employee morale and productivity.
The project received LEED certification. Sustainable strategies throughout the building include a rooftop solar array, limited water usage inside and out, EV charging stations, efficient lighting and mechanical systems available for demand response, and low-emitting materials selections.
PHOTO CREDIT: